Laundry cabinets in Rockhampton get the hardest working conditions in the house: a tub that splashes, a dryer that vents heat, and a humid subtropical summer outside the door. Rockhampton Custom Cabinets builds laundry cupboards, hamper cabinets, sink units and bench runs to the measured room, in moisture-resistant board with heat-sealed edges, so the cabinet beside the tub is still square in ten years. A laundry is usually the smallest room being renovated and the one where millimetres decide whether a front-loader fits under the bench at all, which is why the machines are measured before the cabinets are drawn. Work covers the lot: a full laundry fit-out in a new Gracemere build, a cupboard laundry in a unit, or one tub cabinet replaced where the old one has swollen. Every quote follows a free on-site measure and arrives in writing. Call 0485 032 128 to book one.
GET A FREE QUOTE
Rockhampton Custom Cabinets

A laundry is a storage problem with plumbing in it. The cabinet types below are the pieces that solve it, and most Rockhampton laundries use four or five of them rather than all eight.
A closed laundry cupboard keeps detergent, bleach and cloths out of sight and out of reach of children, which matters more in a laundry than anywhere else in the house. Full-height cupboards take the awkward items a kitchen has no room for: the mop, the bucket, the spare toilet rolls, the dog food. Doors are specified in the same finishes as a kitchen, from melamine through to two-pac polyurethane, and a lock is fitted where chemicals are stored low. Shelves are set adjustable rather than fixed, because what a laundry stores changes as a household does.
A hamper cabinet replaces the plastic basket on the floor with a tilt-out or pull-out bin inside the cabinetry, often split into two or three compartments so sorting happens at the point of undressing rather than at the machine. The pull-out version runs on the same full-extension runners as a kitchen pot drawer and carries the weight of a full load of wet towels. A tilt-out front suits a narrow laundry where a drawer cannot open fully. Ventilation holes in the carcase back are not optional for a hamper, because damp washing in a sealed box is how a laundry starts to smell.
A laundry tub set into a cabinet gives bench space either side of it and hides the trap, the hoses and the cleaning products underneath. The cabinet under a tub takes more water than any other cabinet in the house, so the base is specified in moisture-resistant board, the cut-out is sealed, and the floor of the cabinet is lined. A 45-litre tub is the common choice for a family laundry; a smaller inset bowl suits a cupboard laundry where bench length matters more than tub volume. The tap is set behind the bowl rather than over it so the bench stays usable.
Drawers earn their place in a laundry for the same reason they do in a kitchen: they bring the contents out instead of asking somebody to kneel. A bank of three drawers beside the machines holds pegs, cloths, shoe-cleaning gear and the iron, each in its own depth. Deep drawers take folded linen and towels, which turns a laundry into genuine linen storage and frees a hallway cupboard. Runners are rated to roughly 40kg so a drawer full of wet washing or linen still runs true, and soft-close is fitted as standard.
A bench run over front-loading machines turns two appliances into a folding station, and it is the single change that makes a small laundry work. The bench needs to clear the machine height plus the room to slide it out for service, so the cabinetry is built to the measured machines rather than a nominal 850mm. Where a top-loader is in use, the bench stops short and the lid stays clear, which is a layout decision taken before anything is cut. Laminate is the usual surface here because it tolerates a wet load set down on it.
Overheads above the bench take the items used weekly and keep the bench clear for work. A tall narrow cupboard, often only 300mm or 400mm wide, swallows the broom, the mop and the vacuum, which otherwise live in a corner of the room. An internal power point in that cupboard lets a stick vacuum charge where it is stored. Overheads are taken to the ceiling in most Rockhampton laundries, because the alternative is a dust shelf at eye height in a room that already runs humid.
A pull-out drying rail inside a cabinet handles the wet-season washing that cannot go on the line, and in a city averaging 717mm of rain a year that is a real need rather than a luxury. A fold-down ironing board built into a cabinet front saves the space a standing board occupies. A pull-out towel rail, a slide-out hanging rod for shirts straight off the machine, and a chute for pegs are the small inclusions that get used daily. Each is a fitting selected at design stage because each needs its own cabinet width.
Standard cabinet widths run in 150mm steps, with 600mm and 900mm doing most of the work in a laundry. A washing machine needs roughly 600mm to 650mm of clear width and a dryer about the same, plus clearance for hoses behind, so the usual plan is a 1,200mm to 1,300mm machine bay with cabinetry either side. Custom cabinetry matters here precisely because the leftover space is rarely a round number: a 740mm gap becomes a 740mm cabinet rather than a 600mm cabinet and a 140mm filler panel. The machines are measured before the drawing is finalised.


Rockhampton Custom Cabinets

Rockhampton Aero records about 717mm of rain a year, most of it in summer, and a January mean maximum of 32.6 degrees (Bureau of Meteorology, station 039083). A laundry adds its own water and heat on top of that, which makes it the room where cheap cabinetry fails first and fastest.
Moisture-resistant board, specified as HMR, is the standard carcase for a Rockhampton laundry rather than an upgrade. Failure starts at a raw cut edge: the tub cut-out, the hole drilled for the waste, the underside of the bench beside the machine. Every cut edge is sealed and edge banding is heat-sealed to the panel so vapour cannot get behind it. The base of the tub cabinet gets a moisture barrier, because the slow leak from a hose fitting is the most common cause of a swollen laundry cabinet and it is never noticed early.
A laundry bench gets wet washing put down on it, bleach spilled on it and a hot iron rested on it, so the surface is chosen for tolerance rather than appearance. Laminate with a sealed, moisture-resistant substrate handles all three and is the sensible default. Where stone or porcelain is wanted for appearance, the cut-out edges around the tub are sealed and the overhang is supported, because an unsupported stone edge over a machine bay is where cracks start. Engineered stone cannot be supplied or installed at all, which is covered below.
A vented dryer inside a closed cupboard needs somewhere for the hot, wet air to go, or the cupboard becomes a humidity box and the cabinetry pays for it. Where a dryer sits in cabinetry, a vent path is built in: a grille in the door, a gap at the plinth, or ducting to an external wall. A condenser dryer avoids most of that but still needs airflow around it. A machine recess is left slightly oversize at the back so hoses are not kinked and air can move behind the appliances.
Laundry hardware is handled with wet hands and loaded with heavy, damp washing, which is harder service than a kitchen gets. Runners are specified to carry around 40kg, and up to roughly 70kg under a loaded hamper or linen drawer. Hinges are rated beyond 100,000 open-and-close cycles. In a humid room the finish on the metal matters as much as the rating, so hardware is chosen in a corrosion-resistant finish rather than a bare steel one. Soft-close is standard, not an extra line in the quote.
Tub, taps, waste and machine connections are plumbing work, and power points behind a machine or inside a vacuum cupboard are electrical work. In Queensland both must be done by licensed trades, and that is not a corner a cabinetmaker can cut. Those visits are sequenced against the cabinetry install so the tub is set and connected in the same run of days rather than weeks apart. Where a laundry is moving rather than being replaced in place, the plumber is on site before the cabinets are built.
Rockhampton Custom Cabinets

A laundry is a small job, and small jobs are exactly where a distant supplier becomes expensive. The three reasons below are the practical ones.
The nearest IKEA store sits roughly 600km south near Brisbane, and the Kawana address is a click-and-collect collection point rather than a showroom with a planner. On a laundry that distance bites twice: a single damaged panel means a reorder and a wait, and a cabinet cut 20mm wrong means another freight run. Cabinetry made in Rockhampton can be remeasured in person and remade in days. For a one-cabinet job, that difference is the whole decision.
Rockhampton Custom Cabinets measures, builds and installs the same laundry, so the person who recorded the machine sizes is answerable for whether the machines fit. Plumbing and electrical connections are booked with licensed trades against the install date rather than left to the homeowner to chase. Where a tub is being replaced, the old unit is removed on the same visit the new cabinetry goes in, so the laundry is out of action for a day rather than a fortnight.
Twelve years of cabinetry across Rockhampton covers every laundry type the city has: the back-verandah laundry of a raised timber home, the internal laundry of a 1970s brick lowset, the cupboard laundry of a unit and the walk-through laundry of a new estate build. Public liability cover is held to $20 million and the ABN is 56 573 390 615, both checkable. Board thickness, edge sealing and hardware ratings are named in the written quote, so the specification is a commitment rather than a claim.


Rockhampton Custom Cabinets

Laundry cabinetry is the cheapest cabinetry job in the house and the one most often quoted vaguely. The figures below are published Australian guide ranges, quoted as a frame of reference rather than as a Rockhampton measurement, and the only accurate number for a specific laundry comes from a written quote after an on-site measure.
Four things move the price: the linear metres of cabinetry, whether a tub and bench are included, the door finish, and whether the plumbing stays where it is. Keeping the tub and machine positions avoids plumbing relocation, which is frequently the largest single difference between two quotes on the same room. A hamper pull-out, a drying rail and a built-in ironing board are individually modest and add up, so they are itemised. Moving from melamine doors to two-pac lifts the cabinetry cost across the whole room.
Published Australian guides put laundry cabinetry and benchtop, installed, at roughly $1,300 at the low end, about $3,600 as an average and around $7,800 at the high end. A whole-room laundry renovation runs about $5,000 to $10,000 for a cosmetic refresh, $10,000 to $18,000 mid-range, and $18,000 to $30,000 or more at the high end, where the cabinetry is only one line among tiling, plumbing, appliances and painting. A single replacement tub cabinet sits well below all of those.
Cabinetry and benchtop together are usually the biggest line, then tiling and waterproofing if the room is being stripped, then plumbing and electrical where anything moves. Appliances are normally bought separately by the homeowner. The cheapest real saving in a laundry is leaving the tub and machine positions alone; the most expensive change is moving the laundry to a different room, which turns a cabinetry job into a plumbing job with cabinetry attached.
Rockhampton Custom Cabinets

Four genuinely different options exist for a Rockhampton laundry, and in a square room with standard machines the cheaper ones are not the wrong answer.
Custom cabinetry is cut to the measured room, which in a laundry means the leftover 740mm becomes a cabinet rather than a filler panel, the bench clears the actual machines, and the tub cabinet suits the tub chosen. It is the right answer where the room is an odd shape, where a hamper or drying rail has to be built in, and in older timber homes where no wall is square. It is not the cheapest option and is not sold as one.
Flat-pack is the genuine budget route and it works in a square laundry with standard machine sizes. Bunnings Kaboodle is available locally; IKEA means an online order shipped from roughly 600km away then assembled. Cabinet sizes are fixed, so an unusual wall length is absorbed by fillers, and the finish range is the catalogue range. For a rental laundry refresh this is often the sensible call. In a back-verandah laundry on a raised timber home it usually is not.
Modular units sit between flat-pack and custom: pre-assembled cabinets in set widths, bought as a tub unit, a bench unit and a tall cupboard, then installed together. The advantage over flat-pack is that the boxes arrive built and square. The limitation is the same as flat-pack: the widths are fixed, so the room is made to suit the cabinets. Modular works well in a new estate laundry and poorly in a room with a 2,340mm wall.
A freestanding tub-and-cabinet unit is the quickest fix of all: one unit, one plumber visit, no joinery. It suits a rental, a unit laundry or a stopgap where a budget does not stretch to a fit-out this year. What it will not do is use the full wall, match the rest of the house, or give bench space either side of the tub. Where a laundry is getting one upgrade and the tub is the problem, it is a reasonable choice, and it is worth saying so rather than quoting a full fit-out.


Rockhampton Custom Cabinets

Most Rockhampton laundries are small, and the layout decides what the cabinetry can do. The four arrangements below cover almost every laundry in the city.
A European laundry hides a stacked washer and dryer in a cupboard, usually in a hallway or bathroom, behind bifold or sliding doors. The whole design turns on depth: roughly 650mm of internal depth is needed for the machines plus hoses, which is deeper than a standard linen cupboard. A shelf above takes detergent and a slim pull-out beside it takes the basket. Ventilation is the detail that is most often missed, and a sealed cupboard with a dryer in it will not stay sound in this climate.
A galley laundry puts the tub and bench on one wall and storage on the other, and it needs about 1,000mm of clear walkway between them for a door to open and a person to stand. Where the room is narrower than that, cabinetry goes on one wall only and the opposite wall takes shallow 300mm storage or a hanging rail. Overheads to the ceiling do the work the floor area cannot. A door that swings into the room rather than out of it often costs more usable wall than any cabinet decision.
Side-by-side machines need roughly 1,200mm to 1,300mm of wall and allow a continuous bench over the top, which is the better arrangement where the wall exists. Stacking a dryer over a front-loader halves the footprint and frees a metre of wall for a tall cupboard, at the cost of reaching up to unload. Stacking only works with a front-loading washer and a dryer rated to sit on it, so the appliances are confirmed before the cabinetry is drawn.
A great many raised timber homes across Allenstown, Wandal, The Range and Berserker have their laundry on an enclosed back verandah, which brings two problems: the floor slopes for drainage and the walls are rarely square or fully lined. Cabinetry there is scribed to the wall line measured on the day and levelled on adjustable legs, with the kickboard cut to the actual floor. Exposure matters too, so the finish and the hardware are specified for a room that gets closer to outside conditions than an internal laundry does. The same approach applies to built-in storage elsewhere in an older home.

The first visit is a free, no-obligation measure, recording the room as it actually is and working through how it needs to function. Older Rockhampton homes and Queenslander walls are rarely square, and a commercial tenancy is rarely handed over as drawn, so measuring on site is the only way to get it right. A clear design and a written, itemised quote follow, so the inclusions and the cost are known before anything is ordered. Nothing is built until the plan is approved.

Once the design is approved, the cabinets are made to measure in the Central Queensland workshop. Carcases are built in quality board, including HMR moisture-resistant board for kitchens, laundries, vanities and commercial wet areas, which is the sensible specification in a humid climate. Soft-close hinges and drawer runners are fitted as standard, with hardware such as Blum or Hettich. Everything is prepared and checked before it leaves the workshop for installation.

The same team that built the cabinetry delivers and installs it, so the people who made it are the people fitting it. Installation works cleanly and carefully around a household or a trading business, whether that is a full kitchen in Norman Gardens, a built-in wardrobe in Frenchville or a service counter that has to be in before opening. Benchtops, doors and drawers are aligned and adjusted on the day for a proper finish. The site is tidied before the team leaves.
Published Australian guides put laundry cabinetry and benchtop, installed, at roughly $1,300 at the low end, about $3,600 on average and around $7,800 at the high end. A full laundry renovation including tiling, plumbing and appliances runs about $5,000 to $10,000 for a refresh and $10,000 to $18,000 mid-range. Replacing a single tub cabinet sits well below those figures. Those are Australian guide ranges rather than a measurement of this market, so a written quote after a free on-site measure is the only accurate number.
Yes, and in a small laundry it is the change that makes the room work, turning the machines into a folding station. The cabinetry is built to the measured height of the actual machines plus the clearance needed to slide them out for service, rather than to a nominal bench height. It requires front-loading machines, because a top-loader needs its lid clear. Laminate is the usual surface for that bench because it tolerates a wet load being set down on it.
Rockhampton Aero records about 717mm of rain a year, most of it falling in summer (Bureau of Meteorology station 039083), and a laundry adds a splashing tub and a venting dryer on top of that. Cabinets fail at raw cut edges first, particularly the tub cut-out and the waste hole, where vapour gets into the board and the edge swells. Moisture-resistant board with heat-sealed edging, sealed cut edges and a lined tub cabinet base is the standard specification here rather than an upgrade.
Cabinets are manufactured while the existing laundry is still in use, so the disruptive part is short: removal and install usually run across one to two days, with a stone or porcelain benchtop templated after the cabinets are set and fitted several days later. A licensed plumber connects the tub and machines and a licensed electrician handles any power changes, both booked against the install date. A whole-room renovation with tiling and waterproofing takes longer because those trades set the pace.
Usually yes, because both are cabinet-width decisions rather than floor-area decisions. A pull-out hamper needs a cabinet of about 400mm to 600mm and runs on the same full-extension runners as a kitchen pot drawer; where a drawer cannot open fully, a tilt-out front does the same job in less space. A pull-out drying rail fits inside a tall cabinet and earns its place in a city averaging 717mm of rain a year. Both are specified at design stage because each needs its own width reserved.
Yes. In a square laundry with standard machine sizes, flat-pack from a range such as Kaboodle does the job at a lower price, and for a rental refresh that is often the sensible call. A freestanding tub-and-cabinet unit is the fastest fix where the tub is the only problem. Custom cabinetry earns its price where the room is an odd shape, where fittings such as a hamper or drying rail must be built in, or in an older timber home where no wall is square and fillers would otherwise cover the difference.
GET A FREE QUOTE
BUSINESS
SERVICES
OPERATING HOURS
Sun: 7:00am - 9:00pm
Mon: 7:00am - 9:00pm
Tue: 7:00am - 9:00pm
Wed: 7:00am - 9:00pm
Thu: 7:00am - 9:00pm
Fri: 7:00am - 9:00pm
Sat: 7:00am - 9:00pm